| Standard scope | Addresses CNG stations that fuel vehicles with compressed natural gas. | Addresses LNG stations that fuel vehicles with liquefied natural gas. | Confirm which standard applies to each station system and component. A standard is not, by itself, a manufacturer ranking or product certification. |
| Fuel condition at dispensing | Natural gas is stored and dispensed as a compressed gas. | Natural gas is stored and dispensed as a cryogenic liquid. | Check that the selected equipment is designed for the fuel state, pressure, temperature, and operating conditions stated for the project. |
| Typical major equipment | May include gas compression, storage cascades, priority control, gas cooling where required, and CNG dispensers. | May include LNG storage tanks, transfer pumps or pressurization equipment, cryogenic piping, and LNG dispensers. | Review the station process diagram and equipment schedule; the actual configuration depends on capacity, site conditions, and vehicle requirements. |
| Pressure and temperature hazards | Equipment and piping must be suitable for the specified high-pressure gas service. | Equipment and piping must be suitable for cryogenic liquid service and the applicable pressure conditions. | Request documented design ratings, materials compatibility information, and operating limits for the intended service. |
| Safety and protective design | Station design should address foreseeable gas-release, ignition, overpressure, and vehicle-fuelling hazards. | Station design should address foreseeable LNG-release, cryogenic-contact, vaporization, ignition, and vehicle-fuelling hazards. | Review the project-specific hazard assessment, protective systems, emergency arrangements, and applicable local fire and building requirements. |
| Controls and emergency functions | Control and emergency functions should match the station design and its identified hazards. | Control and emergency functions should account for LNG storage, transfer, dispensing, and the station’s identified hazards. | Ask for control descriptions, shutdown logic, alarm functions, and evidence that safety functions have been tested and documented. |
| Inspection and maintenance | Inspection and maintenance planning should reflect the station design, equipment, and operating conditions. | Inspection and maintenance planning should reflect cryogenic equipment and the station’s operating conditions. | Compare maintenance instructions, inspection records, spare-parts provisions, and staff training requirements for the offered configuration. |
| L-CNG or LNG-to-CNG configuration | Relevant to CNG dispensing and associated compressed-gas equipment, depending on the station layout. | Relevant to LNG storage and handling equipment, depending on the station layout. | For an LNG-to-CNG station, assess the LNG system and the downstream gas-processing, compression, storage, and dispensing systems separately. Confirm the applicable standards and local rules for the complete installation. |
| Evidence for a procurement review | Request the design basis, equipment specifications, operating instructions, and conformity documentation applicable to the project. | Request the design basis, cryogenic equipment specifications, operating instructions, and conformity documentation applicable to the project. | Check that documentation identifies the exact equipment configuration and applicable editions of standards; do not rely on a general claim of “ISO compliant.” |