| 1 | Process and alloy experience | Confirm experience with the required process—high-pressure, low-pressure, or gravity die casting—and the specified casting alloy. | Relevant project examples, process capability details, and a proposed tooling approach for the part and alloy. | Mold design and operating conditions differ by process and alloy; experience in one process does not automatically demonstrate capability in another. |
| 2 | Tool steel and heat treatment | Check whether the proposed mold material and heat-treatment plan are appropriate for the alloy, thermal loads, and expected production conditions. | Material certificates, steel grade, heat-treatment records, and the supplier’s material traceability process. | H13 is a commonly used hot-work tool steel, but the suitable grade and treatment should be agreed for the specific tool and application. |
| 3 | Design engineering and simulation | Assess how the supplier reviews gating, runners, vents, cooling, ejection, shrinkage, and part manufacturability before cutting steel. | Design-for-manufacturing review, mold layout, simulation assumptions, and a documented plan for addressing identified risks. | Simulation can help evaluate filling and solidification behavior, but it does not replace mold trials and inspection of actual castings. |
| 4 | Dimensional quality and inspection | Confirm that critical dimensions, datum strategy, measurement methods, and acceptance criteria are defined before production. | Inspection plan, measuring-equipment calibration records, sample dimensional reports, and agreed drawing revision control. | ISO 8062-3 provides a system of dimensional tolerances and machining allowances for castings; tolerances should be specified for the actual part and drawing. |
| 5 | Quality management and traceability | Review the quality system, nonconformance handling, document control, and traceability of materials and tooling changes. | Current certificates where applicable, audit information, corrective-action examples, and quality records for comparable work. | ISO 9001 specifies quality-management-system requirements. IATF 16949 is an automotive quality-management standard and may be required by automotive customers or supply-chain contracts. |
| 6 | Trials, validation, and approval support | Define trial stages, sample quantities, inspection scope, defect resolution, and approval responsibilities in the project plan. | Trial schedule, sample inspection results, corrective-action log, and—when required by the customer—PPAP documentation. | PPAP is used in automotive supply chains to demonstrate that production processes can meet customer requirements; its use depends on customer and contract requirements. |
| 7 | Lifecycle support and international delivery | Clarify spare inserts, maintenance guidance, repair response, packaging, shipping terms, export documents, and ownership of mold data. | Written service terms, maintenance schedule, spare-parts list, delivery plan, and agreed procedures for tool transfer or repair. | Mold life varies with alloy, part geometry, process settings, maintenance, and operating conditions; compare documented assumptions rather than relying on an unqualified life estimate. |