| Copper Purity | Copper content ≥99.9% by mass | Material chemistry shall meet the agreed copper grade and project specification. Impurities must remain within the applicable material standard limits. | Heat or lot traceability, chemical composition report, and independent laboratory verification when required. | 15% |
| Electrical Conductivity | Minimum 100% IACS at 20°C | Measured conductivity shall be at least 58 MS/m at 20°C, equivalent to 100% IACS. Test temperature and method must be recorded. | Conductivity test report identifying the test instrument, temperature correction, sample number, and result in % IACS or MS/m. | 20% |
| Material Grade | Use a clearly identified high-conductivity copper grade | The grade, temper, and applicable standard must be stated on the quotation, drawing, purchase order, and certificate. | Material designation, mill certificate, grade declaration, and production batch identification. | 8% |
| Cross-Section Dimensions | Width, thickness, length, hole pattern, and edge condition according to the approved drawing | All dimensions must comply with the customer-approved drawing. Dimensional tolerances should be agreed before production because they vary by product form and manufacturing process. | Controlled technical drawing, inspection plan, calibrated measuring records, and first-article inspection report. | 12% |
| Surface Quality | Clean, smooth, and free from cracks, laminations, sharp burrs, oil contamination, and harmful oxidation | Minor discoloration may be accepted only when it does not affect conductivity, contact resistance, coating adhesion, or installation safety. | Visual inspection standard, sample photographs, surface inspection records, and corrective-action procedure. | 8% |
| Mechanical Properties | Strength and hardness suitable for the specified temper and installation method | Tensile strength, elongation, and hardness shall meet the selected copper material standard or the approved project specification. | Mechanical test certificate with specimen direction, test method, batch number, and measured values. | 7% |
| Hole and Slot Accuracy | Hole diameter, slot length, pitch, edge distance, and burr height according to the drawing | Holes must allow correct fastener fit and alignment without reducing the required electrical contact area or mechanical strength. | CMM or calibrated gauge records, hole-position inspection report, and approved sample. | 8% |
| Contact Resistance | Stable low-resistance electrical connection at joints | Joint resistance limits should be defined according to the system design, contact surface treatment, fastener type, and applicable assembly standard. | Four-wire resistance test data, joint assembly procedure, torque specification, and contact-surface preparation instructions. | 7% |
| Plating or Surface Treatment | Optional tin, nickel, or other agreed coating for corrosion and contact-performance requirements | Coating type, coverage, thickness, adhesion, and appearance must be specified. Uncoated copper may be acceptable when the installation environment permits it. | Coating thickness report, adhesion test record, chemical-process description, and salt-spray data when applicable. | 5% |
| Thermal Performance | Current-carrying capability based on cross-section, installation arrangement, ambient conditions, and allowable temperature rise | Rated current must not be judged from copper conductivity alone. The supplier should provide calculation conditions and temperature-rise assumptions. | Technical calculation, temperature-rise test report when required, and installation derating information. | 5% |
| Standards and Compliance | Applicable requirements clearly identified | Specifications should reference the relevant copper material, electrical assembly, grounding, or customer standards. Claims must be supported by valid documents. | Declaration of conformity, quality certificates, inspection procedures, and third-party reports where contractually required. | 5% |
| Traceability and Quality Control | Full traceability from raw material to finished bus bar | Each shipment should be linked to a production lot, material heat, inspection result, and packaging record. | Quality control plan, incoming-material records, in-process inspection records, final inspection report, and lot labels. | 5% |
| Packaging and Shipment | Protection against bending, impact, moisture, contamination, and surface damage | Bars should be separated, securely fixed, protected from abrasion, and packed according to their length, weight, finish, and transport conditions. | Packaging specification, loading photographs, moisture-protection method, and shipping inspection checklist. | 3% |
| Pre-Production Approval | Sample or first article approved before mass production | Production should begin only after confirmation of material grade, dimensions, conductivity, surface finish, holes, and packaging requirements. | Signed sample approval, first-article report, approved drawing revision, and change-control procedure. | 2% |