| Steel grade and condition | For example, low-carbon steel, medium-carbon steel, or high-carbon steel; specify incoming condition and applicable material standard. | The grade and condition affect drawability, die selection, lubrication, pass schedule, and whether intermediate annealing is needed. | Confirm material certificates, chemistry, incoming tensile properties, and surface condition. |
| Incoming wire diameter | Record the actual starting diameter and its tolerance, such as a nominal 6.5 mm rod with a supplier-defined tolerance. | The machine, payoff, guides, and first die must accommodate the largest incoming diameter and the coil dimensions. | Check measured diameter variation, ovality, coil weight, and payoff compatibility. |
| Finished wire diameter | Define the target diameter, permitted tolerance, and any roundness or surface requirements for each product size. | The final die, capstan arrangement, measurement system, and line setup must support the required finished size and tolerance. | Run a trial with the intended material and verify diameter at multiple points along the wire. |
| Total reduction and pass schedule | Calculate area reduction from the starting and finished diameters: 100 × [1 − (finished diameter ÷ starting diameter)2]. Determine the number of passes with a process engineer. | The required reduction and material properties help determine the number of dies, capstans, drive power, and need for intermediate treatment. | Validate the pass schedule against the steel grade, lubrication, die limits, and required final properties. |
| Tensile strength and final properties | Specify the required final tensile strength, elongation, and other relevant mechanical properties; values depend on grade, reduction, and heat treatment. | If the product needs a controlled strength or ductility, consider process controls and any required annealing or surface treatment equipment. | Test samples to the applicable product specification after the complete process route. |
| Surface finish and cleanliness | Describe acceptable scale, scratches, seams, residue, and surface finish; state whether pickling, mechanical descaling, or coating is required upstream. | Surface preparation, die condition, lubricant delivery, and cleaning systems influence finish and die life. | Inspect sample wire under agreed lighting and check lubricant compatibility with the downstream process. |
| Production volume and operating pattern | State target output per shift or year, product mix, changeover frequency, planned operating hours, and expected downtime. | These requirements guide line configuration, automation level, spooler capacity, and maintenance access. Rated speed alone does not determine usable output. | Request output estimates based on the actual material, diameter range, pass schedule, and changeover plan. |
| Take-up and finished coil format | Define coil or spool type, maximum finished package weight, outside diameter, width, and downstream handling method. | Take-up equipment and tension control must suit the product size, package dimensions, and handling equipment. | Confirm package stability, safe lifting method, and compatibility with storage and transport. |
| Utilities, layout, and safety | Provide available electrical supply, floor space, foundation details, ventilation, compressed air, and applicable site safety requirements. | Machine installation depends on site utilities, access for maintenance, guarding, emergency stops, and material flow. | Compare the equipment layout and utility schedule with the plant conditions before purchase. |