| Travel height and number of stops | Measure the vertical distance between the lowest and highest landings, and record every stop, entrance, and floor level. | Low-rise passenger elevators commonly operate at speeds around 0.5–1.0 m/s, but the appropriate speed depends on travel, traffic, and the selected system. | For a short, low-rise route, compare compact traction and hydraulic options; for greater travel or frequent use, assess traction systems and traffic performance. | Do not select by appearance alone. Confirm travel limits, operating speed, stopping accuracy, and permitted system type with the elevator designer. |
| Building structure and support | Identify the supporting frame, slab edges, foundations, existing walls, and any restrictions on fixing equipment to the building. | Obtain structural calculations for the shaft or tower, landing supports, guide-rail brackets, and machine supports. Loads and fixing details are equipment-specific. | A self-supporting steel or glazed tower may suit a site with limited internal space, provided its foundation and building connections are engineered. | Have a qualified structural engineer verify load paths, wind effects, deflection limits, and the capacity of existing construction before ordering equipment. |
| Shaft, pit, and overhead space | Survey the proposed shaft footprint, available pit depth, overhead clearance, door openings, and access for installation. | Pit and overhead dimensions vary by elevator design and applicable code. Use the selected system’s approved layout drawings rather than generic dimensions. | Where space is constrained, compare systems specifically designed for reduced pit or overhead requirements and confirm any associated limitations. | Check clearances, safe access, drainage, and maintenance space. Never reduce required clearances without written design approval and code review. |
| Glazing, sunlight, and thermal exposure | Record façade orientation, direct-sun exposure, shading, local climate, and the temperature conditions expected inside the enclosure. | Glazing can increase solar heat gain and glare. Glass specification, shading, ventilation, and any required cooling should be assessed together. | Use safety glazing specified for the application, with suitable solar-control or shading measures where exposure warrants them. | Confirm that equipment temperature limits are maintained. A glazed enclosure may require additional ventilation or thermal-control measures. |
| Wind, rain, and outdoor exposure | Determine whether the lift will be fully indoors, partly exposed, or outdoors; check wind exposure, rain entry, snow, and corrosion conditions. | Outdoor installations need coordinated design for local wind loads, water management, corrosion protection, electrical protection, and temperature range. | Choose an enclosure, finishes, and components rated for the actual exposure; provide weather protection at doors and equipment locations where needed. | Verify local building and electrical requirements and specify drainage so water cannot collect in the pit or reach electrical equipment. |
| Passenger capacity and accessibility | Estimate peak demand and identify the users, mobility devices, luggage, and visitor flows the lift must serve. | Car size, door width, controls, audible and visual signals, and access features must be checked against the applicable accessibility rules and project use. | Select a car and entrance arrangement that provide the required usable space and convenient access for the intended passengers. | Accessibility dimensions and requirements vary by jurisdiction. Confirm them with the local authority and the project’s accessibility professional. |
| Power, machinery, and building services | Check available electrical supply, equipment-room options, cable routes, lighting, communications, and emergency power requirements. | Power demand and machinery location depend on the selected drive system and capacity. Coordinate electrical provisions using the manufacturer’s design data. | Compare machine-room and machine-room-less layouts against the site’s space, access, and maintenance constraints. | Plan for required emergency communication, lighting, isolation, and rescue provisions in accordance with local regulations. |
| Installation access and construction sequence | Review delivery routes, lifting points, crane or hoist access, working space, occupied-building restrictions, and construction staging. | Large glazed panels and structural members may require planned delivery and lifting. Installation access can affect panel sizes and the construction sequence. | For restricted sites, consider modular components and a coordinated installation plan, subject to engineering and transport limits. | Agree on access, temporary protection, shutdowns, and site responsibilities before construction begins. |
| Code approval, inspection, and maintenance | Identify the authority having jurisdiction, applicable elevator and building codes, inspection process, and ongoing maintenance access. | Requirements depend on location and installation type. Common frameworks include ASME A17.1/CSA B44 in North America and EN 81 standards in many other markets. | Choose a compliant design with clear access for inspection, servicing, and safe rescue operations. | Confirm the adopted code edition and approval pathway with local authorities before final design and procurement. |