| Mounting standard and series | Identify the mounting-flange standard, size designation, and dimensional series shown on the pump drawing or equipment documentation. | Compare the applicable mounting dimensions with SAE J744 or the relevant ISO 3019 series and edition. | Use the same standard and size series, or verify every interface dimension against the manufacturer’s certified drawing. Do not assume that similarly sized SAE and ISO patterns are interchangeable. |
| Mounting pilot | Measure the pilot outside diameter, pilot depth, and the mating recess in the equipment. | Compare the pilot and recess dimensions, tolerances, and fit with the applicable standard drawing and pump drawing. | The pilot must locate the pump correctly and seat fully without interference or excessive clearance. |
| Bolt pattern | Check the number of mounting bolts, hole or thread size, bolt-circle dimensions, and hole positions. | Compare the mounting pattern with the applicable SAE J744 or ISO 3019 configuration. | All holes must align, and the specified fasteners must engage correctly. Do not use bolt-hole alignment alone as proof of a compatible mount. |
| Mounting face and seating depth | Check the mounting-face condition, flange thickness, register depth, and clearance to the equipment housing. | Use the pump and equipment drawings; confirm the dimensions and tolerances for the selected mounting configuration. | The flange must sit flush and the pump must clear adjacent components. Avoid forcing the pump into position with the mounting bolts. |
| Shaft type and dimensions | Identify a keyed, splined, or other specified shaft; measure shaft diameter, extension length, keyway dimensions, or spline details as applicable. | Compare the shaft-end configuration and dimensions with the applicable SAE J744 or ISO 3019 shaft specification and the driven equipment. | The shaft must match the mating coupling or drive, including its engagement length and permitted fit. A matching diameter alone is not sufficient. |
| Spline details | For a splined shaft, confirm the spline form, tooth count, major and minor dimensions, fit class, and engagement length. | Check the relevant standard designation and the pump and coupling drawings; use a suitable spline gauge or qualified measurement method where required. | The spline designation and fit must match the mating part. Do not select a spline by tooth count alone. |
| Rotation and drive direction | Confirm the required shaft rotation as viewed from the specified shaft end, along with any drive or installation restrictions. | Check the pump nameplate, technical documentation, and system schematic. | The replacement must be approved for the required rotation and operating arrangement. Confirm before installation; incorrect rotation can prevent proper operation or cause damage. |
| Port connection type | Identify whether each connection is a flange, straight thread, tapered thread, or another specified port type. | For split-flange connections, compare the applicable SAE J518 or ISO 6162 interface. For threaded ports, use the specified port standard and thread designation. | Match the connection type, sealing method, and standard. Similar-looking threads or flange parts should not be treated as interchangeable without verification. |
| Port size and sealing face | Record each port designation, flange or thread size, sealing-face dimensions, and the required O-ring or gasket arrangement. | Compare with the pump drawing, hose or adapter drawing, and the applicable port-interface standard. | The port must accept the intended fitting and seal correctly at the system’s specified operating conditions. |
| Port position and orientation | Check inlet and outlet locations, port spacing, orientation, and available clearance for hoses, fittings, and service access. | Compare the port layout with the original installation and the proposed pump’s dimensioned drawing. | Ports must connect without forced alignment, hose twist, or interference with the frame and nearby components. |
| Final drawing verification | Record the measured values, units, standard designations, and drawing revisions for the pump and mating equipment. | Review a dimensioned manufacturer drawing and confirm any uncertain dimensions with the supplier before ordering. | Approve the candidate only when mounting, shaft, and port interfaces all match and the required operating specifications are also suitable. |