| 1 | Automotive quality systems | 15% | Quality management, traceability, corrective action, and change control relevant to automotive production. | Current certificates, audit results, control plans, and sample nonconformance reports. |
| 2 | Wheel-cover molding experience | 13% | Experience with large, visible molded parts, including surface appearance, fit, retention features, and dimensional control. | Relevant project references, part samples, and examples of production issue resolution. |
| 3 | Press capacity and process fit | 12% | Clamping force, platen and tie-bar dimensions, shot capacity, and machine availability appropriate to the part and tool. | Machine list, tonnage range, press specifications, and a documented press-to-tool feasibility review. |
| 4 | Tooling design and maintenance | 12% | Mold design support, cooling and venting strategy, tool-life planning, spare parts, and preventive maintenance. | Mold-flow or design-review process, maintenance schedule, tool ownership terms, and repair-response plan. |
| 5 | Material and environmental performance | 10% | Ability to process specified polymers and meet applicable requirements for heat, impact, weathering, color, and recyclability. | Material datasheets, approved-source controls, test reports, and resin change-management records. |
| 6 | Dimensional and cosmetic inspection | 10% | Inspection capability for critical dimensions, warpage, fit, color consistency, and visible surface defects. | Measurement-system records, inspection standards, capability studies, and defect-limit samples. |
| 7 | Production capacity and delivery | 9% | Available machine time, shift coverage, capacity planning, lead times, and ability to manage demand changes. | Capacity model, recent delivery performance, production schedule, and contingency plan. |
| 8 | Secondary operations and assembly | 7% | In-house or controlled finishing, decoration, component assembly, packaging, and labeling where required by the specification. | Process flow, supplier controls for outsourced work, and inspection records for completed assemblies. |
| 9 | Geographic and supply-chain resilience | 6% | Freight routes, proximity to assembly locations, continuity planning, and exposure to logistics or material disruptions. | Shipping plan, business-continuity plan, critical-material sourcing information, and recovery targets. |
| 10 | Total cost and commercial transparency | 6% | Tooling, piece price, packaging, freight, inspection, maintenance, and change-related costs across the program life. | Itemized quotation, assumptions, payment terms, tool-cost breakdown, and documented price-change process. |